Projects / BMW Spartanburg
Case Study · Engaged through ABM

BMW Spartanburg: Tour Routes, Pits, Rafters, and a Plant-Wide Column Program

Through ABM, Clean Metro ran annual projects inside BMW's Spartanburg plant: VIP tour routes, machine pits, and combustible dust removal from the rafters.

Book a Site WalkCall (803) 575-0203

Photos on this page are from similar CMI jobs. We do not publish photos from inside this client's site.

Harnessed tech in a boom lift dry ice blasts lint-caked roof trusses and deck high above a textile plant floor.
Representative photo from a similar CMI job. Not taken at BMW Spartanburg.
Engaged through
ABM
Scope
Annual projects: VIP tour routes, machine pits, combustible dust in rafters; plant-wide column program
Scale
Multi-year

The work

A showcase initiative for BMW's CEO started as three tiers of 50 ft x 50 ft column-square example areas. The first tier included dry ice blasting ducts and structure to prepare for paint. Later tiers stepped down in scope. Every tier included painting columns to the column line and renumbering them, painted or in vinyl.

The example areas became a plant-wide initiative.

From similar CMI jobs

CMI tech pole-vacuums overhead pipe racks and cable trays from a platform below.
CMI tech pole-vacuums overhead pipe racks and cable trays from a platform below.
CO2 cloud lifts off a steel grate as a tech strips built-up grime from yellow-painted equipment.
CO2 cloud lifts off a steel grate as a tech strips built-up grime from yellow-painted equipment.
Before and after of an overhead process pipe, with a tech on a lift doing the cleaning.
Before and after of an overhead process pipe, with a tech on a lift doing the cleaning.
Crew rolls red epoxy into a taped-off aisle on a plant floor.
Crew rolls red epoxy into a taped-off aisle on a plant floor.

Got a mess on the schedule?

Send us the scope, photos, or a walkthrough date. We'll tell you straight whether it's our kind of work.

Book a Site WalkCall (803) 575-0203

Tap to call (803) 575-0203