Projects / BMW Paint Shop Expansion
Case Study · Engaged through Gray Construction

BMW Paint Shop Expansion: A 140 ft Building Cleaned Toward Production

Gray Construction brought Clean Metro in to clean a 140 ft paint shop expansion across multiple mezzanine levels during live construction.

Book a Site WalkCall (803) 575-0203

Photos on this page are from similar CMI jobs. We do not publish photos from inside this client's site.

A CMI tech in harness uses a backpack vacuum and extension wand to dust high steel on a new fiber draw tower.
Representative photo from a similar CMI job. Not taken at BMW Paint Shop Expansion.
Engaged through
Gray Construction
Scope
Construction clean, multi-level mezzanines
Scale
140 ft paint shop building

The work

Crews used long-reach HEPA vacuum poles and suspended scaffolds to remove fine contamination so the building could move toward production. Gray features this project on its own site.

From similar CMI jobs

Harnessed CMI techs vacuum construction dust off steel framing and platforms inside a new production plant.
Harnessed CMI techs vacuum construction dust off steel framing and platforms inside a new production plant.
A vacuum brush cuts a clean stripe through heavy construction dust on top of new production equipment.
A vacuum brush cuts a clean stripe through heavy construction dust on top of new production equipment.
A harnessed CMI tech on a scissor lift wipes down a steel column on a new fiber draw tower.
A harnessed CMI tech on a scissor lift wipes down a steel column on a new fiber draw tower.

Got a mess on the schedule?

Send us the scope, photos, or a walkthrough date. We'll tell you straight whether it's our kind of work.

Book a Site WalkCall (803) 575-0203

Tap to call (803) 575-0203