Projects / Briggs & Stratton foundry
Case Study · Engaged through Dycos

Briggs & Stratton Foundry: 20,000 sq ft Cleaned and Coated in Production

Briggs & Stratton tasked Dycos with a facility improvement program at an aluminum foundry. Clean Metro wrote and executed the cleaning and coating scope.

Book a Site WalkCall (803) 575-0203

Photos on this page are from similar CMI jobs. We do not publish photos from inside this client's site.

Roof deck line where new white coating meets the original rust-brown steel.
Representative photo from a similar CMI job. Not taken at Briggs & Stratton foundry.
Owner / Site
Briggs & Stratton aluminum foundry
Engaged through
Dycos
Scope
Low-moisture degreasing and coating during production
Scale
About 20,000 sq ft of ceilings, walls, and columns

The work

Low-moisture degreasing, where a small amount of water is injected into high-volume air, cleaned the ceiling and prepped it for coating without flooding the floor below.

About 20,000 sq ft of ceilings, walls, and columns were cleaned and coated while the foundry stayed in production, coordinated with facilities and production staff, without incident. LED lighting went in after.

From similar CMI jobs

Crew rolls red epoxy into a taped-off aisle on a plant floor.
Crew rolls red epoxy into a taped-off aisle on a plant floor.
After: the dust collector finished in fresh green coating against a clear sky.
After: the dust collector finished in fresh green coating against a clear sky.
Tech in a blast hood strips the collector from a boom lift while the blast pot and hoses run below.
Tech in a blast hood strips the collector from a boom lift while the blast pot and hoses run below.