Projects / Lexington Medical Center
Case Study · Engaged through Brasfield & Gorrie

Lexington Medical Center: Final Clean on a 400,000 sq ft Expansion

Under Brasfield & Gorrie, Clean Metro ran final clean on Lexington Medical Center's expansion: the patient wing, the parking tower, and the central utility plant.

Two hard-hatted techs in a lift basket squeegee new curtain wall glass on a hospital tower under construction.
Owner / Site
Lexington Medical Center, West Columbia SC
Engaged through
Brasfield & Gorrie
Scope
Final clean, patient wing, parking tower, and central utility plant
Scale
400,000 sq ft

The work

Crews worked from 80 ft boom lifts on new curtain wall glass, pressure washed the parking deck stairwells, and wiped down new mechanical equipment in the utility plant before turnover.

From the job

80-foot boom lift puts a crew at the top of a new parking deck stair tower to clean the curtain wall glass.
80-foot boom lift puts a crew at the top of a new parking deck stair tower to clean the curtain wall glass.
CMI crew in branded vests wipes down a new chemical-feed skid in a hospital central utility plant before turnover.
CMI crew in branded vests wipes down a new chemical-feed skid in a hospital central utility plant before turnover.
Tech in rain gear pressure washes a new parking-deck stairwell, spray mist filling the shaft.
Tech in rain gear pressure washes a new parking-deck stairwell, spray mist filling the shaft.

Got a mess on the schedule?

Send us the scope, photos, or a walkthrough date. We'll tell you straight whether it's our kind of work.

Book a Site WalkCall (803) 575-0203

Tap to call (803) 575-0203